“INTEGRATED AIRPORT SECURITY SYSTEM (SISA)“
Timisoara International Airport “Traian Vuia” and the Ministry of Transport and Infrastructure signed on 22.09.2022 the financing contract no. 178 for the investment project “Integrated Airport Security System (IASS)”.
The overall objective of the project is to increase aviation safety and airport security.
This acquisition contributes to ensuring a high level of security during the conduct of civil aviation activities at Timisoara Traian Vuia International Airport and its continuous improvement in accordance with the MPGT strategy document and Regulation (EU) No. 139/2014 laying down technical requirements and administrative procedures at aerodromes through the execution of works for the construction of a perimeter security road, a perimeter security fence, the modernization/rehabilitation of access control points 1, 2 and 5, the realization of a PSI substation for rapid intervention, the modernization of video surveillance systems and the realization of external networks serving the objects realized for non-economic activities.
The specific objectives of the investment project are:
- Ensuring a high level of security during civil aviation activities at Timisoara “Traian Vuia” International Airport by building a perimeter security fence by December 2023.
- Ensuring a high level of security during civil aviation activities at Timisoara “Traian Vuia” International Airport by upgrading/rehabilitating access control points 1, 2 and 5 by December 2023.
- Ensuring a high level of security during civil aviation activities at Timisoara “Traian Vuia” International Airport by upgrading video surveillance systems by December 2023.
- Increase the response capacity to ensure a high level of safety at Timisoara International Airport “Traian Vuia” during civil aviation activities by building a Psi substation for rapid intervention until December 2023.
The total value of the project is 136.652.755,34 lei of which the EU co-financing is 97.516.673,66 lei.
The project implementation period is 32 months, starting 12.05.2021 until 31.12.2023. The investment project “Integrated Airport Security System” has been given the code 155595 in MySMIS.
The project is financed by non-reimbursable European funds, through the Large Infrastructure Operational Programme (MIP) 2014-2020, Priority Axis 2 – Development of a multimodal, high-quality, sustainable and efficient transport system, Specific objective 2.3 – Increase the sustainable use of airports.
Beneficiary contact details:
Timisoara International Airport “Traian Vuia”
Project Manager Daniel Dinu, Tel. 0744087122